Factory energy cost analysis · Solar + BESS + EMS

High factory electricity bills…Do you know where the money goes?

A few short peaks can drive up the whole month's electricity cost EV POWER ENERGY analyzes your Load Profile before designing Solar + BESS + EMS to match your factory's real electricity use

  • Starts from real data
  • No need to pick a battery first
  • No obligation to install
High factory electricity bills? A 15-minute peak can set the Demand Charge for the whole month — analyze your Load Profile before investing in Solar + BESS + EMS

What your bill doesn't show

A factory's power bill isn't just about the units you use

A 15-minute peak can set the demand charge for the whole month — before investing in anything, find out where your costs come from.

Peak Load

A few minutes of your factory's highest draw can set the demand charge for the entire month.

Solar Surplus

Solar power produced when you're not using it can slip away without fully cutting your bill.

EV Charging Load

Charging EVs or delivery trucks on site can stack on top of your existing peak if it isn't scheduled well.

Solar + BESS + EMS

Designed around real consumption, not a product spec sheet

What suits one factory may not suit another. So we look at your consumption first, then decide what each part of the system should do.

  1. Solar

    Generates your own power during the day, so you buy less from the grid.

  2. BESS

    Stores energy and releases it when load spikes, helping shave the peak.

  3. EMS

    Monitors consumption and coordinates solar, BESS and loads so they work together.

Step

How the initial energy cost analysis works

Send us your electricity bill or Load Profile and our team will show you where to start

  1. Fill in the form — about 1 minute

    Tell us your monthly bill, your solar status and what you'd like us to look at. Attach a bill or load profile if you have one.

  2. We get back to you

    The EV POWER ENERGY team talks through your site's consumption and asks only for the extra data we need.

  3. Review the real load profile

    We show you where the money goes — peak load, surplus solar or EV charging load.

  4. Recommend the right starting point

    We summarise where to start before designing Solar + BESS + EMS around how you actually use power.

Best for

  • Factories
  • Business
  • EV Fleet

Request a preliminary energy cost analysis

Takes about 1 minute. The EV POWER ENERGY team will get back to you to see where Peak Load, Solar or BESS could help your site

Contact details

Site electricity use

Do you currently have solar? *
What would you like us to look at? (select one or more)

Supporting files

PDF, image or Excel, up to 10 MB

View privacy policy (opens in a new tab) →

Our team will use this information for a preliminary assessment and contact you as requested. No obligation to install

Frequently asked questions

What information do I need to prepare?

Your factory's electricity bill, or a load profile file if you have one (PDF, image or Excel, up to 10 MB). No file yet? Fill in the basics first and send it over LINE after you register.

Do I need to choose a battery model or system size first?

No. We start from your site's real consumption data, then work out which of Solar, BESS or EMS to start with and how big it should be.

Our factory already has solar. Can we still request an analysis?

Yes. We'll check whether your solar output is being fully used, and where BESS or EMS could help with peak load or surplus power.

Do we have to install with you after the analysis?

There's no obligation to install. We use your information for the initial assessment and contact you as requested.

Free analysis
LINE
Factory Energy Cost Analysis: Solar + BESS | EV Power Energy