Peak Load
A few minutes of your factory's highest draw can set the demand charge for the entire month.
Factory energy cost analysis · Solar + BESS + EMS
A few short peaks can drive up the whole month's electricity cost EV POWER ENERGY analyzes your Load Profile before designing Solar + BESS + EMS to match your factory's real electricity use

What your bill doesn't show
A 15-minute peak can set the demand charge for the whole month — before investing in anything, find out where your costs come from.
A few minutes of your factory's highest draw can set the demand charge for the entire month.
Solar power produced when you're not using it can slip away without fully cutting your bill.
Charging EVs or delivery trucks on site can stack on top of your existing peak if it isn't scheduled well.
Solar + BESS + EMS
What suits one factory may not suit another. So we look at your consumption first, then decide what each part of the system should do.
Solar
Generates your own power during the day, so you buy less from the grid.
BESS
Stores energy and releases it when load spikes, helping shave the peak.
EMS
Monitors consumption and coordinates solar, BESS and loads so they work together.
Step
Send us your electricity bill or Load Profile and our team will show you where to start
Tell us your monthly bill, your solar status and what you'd like us to look at. Attach a bill or load profile if you have one.
The EV POWER ENERGY team talks through your site's consumption and asks only for the extra data we need.
We show you where the money goes — peak load, surplus solar or EV charging load.
We summarise where to start before designing Solar + BESS + EMS around how you actually use power.
Best for
Your factory's electricity bill, or a load profile file if you have one (PDF, image or Excel, up to 10 MB). No file yet? Fill in the basics first and send it over LINE after you register.
No. We start from your site's real consumption data, then work out which of Solar, BESS or EMS to start with and how big it should be.
Yes. We'll check whether your solar output is being fully used, and where BESS or EMS could help with peak load or surplus power.
There's no obligation to install. We use your information for the initial assessment and contact you as requested.