BOI backs Solar Factory investment 2026 — what you still get, and what's been dropped | EV Power Energy
FAQ
In 2026, can a factory still get BOI support for rooftop solar for its own use?+
The efficiency improvement measure for energy saving and renewable energy in the 2026 investment promotion guide states in parentheses "excluding the installation of solar power generation systems," and BOI Announcement No. 3/2568 dated 5 June 2025 amends the measure, so applications from 1 July 2025 use the new criteria. If your investment plan covers solar installation only, check with the BOI before applying
Which privilege group is solar panel manufacturing in, and how many years of tax exemption does it get?+
Category 4.2.12.1 (manufacture of solar cells and/or raw materials for solar cells) and category 4.2.12.2 (manufacture of solar panels from cells produced in the same project) are in group A2, which receives an 8-year capped corporate income tax exemption and import duty exemption on machinery — but the 2026 guide states that new investment projects are not promoted
What does the efficiency improvement measure offer?+
A 3-year corporate income tax exemption at 50% of the investment (excluding land and working capital), applied to income from the existing business; import duty exemption on machinery; and foreign experts for 2 years. Where the machinery links to domestic automation machinery manufacturing for at least 30% of its value, the cap rises to 100% of the investment
How do the conditions for SMEs differ from regular factories?+
Under the SME efficiency improvement measure (BOI Announcement No. 5/2568), SMEs get a 5-year corporate income tax exemption at 100% of the investment with a minimum investment of 500,000 baht. Thai shareholders must hold at least 51%, total revenue must not exceed 500 million baht in the 3 years before applying, and the business must register for SME ONE ID before applying
How long do I have to finish the installation, and when do the benefits start?+
The approved plan must be completed within 3 years of the promotion certificate issue date, and the corporate income tax exemption period starts from the date of first income after receiving the certificate
Is the tax exemption cap money the government pays back?+
No. The tax exemption cap is the maximum corporate income tax you don't have to pay during the privilege period. If the business makes little profit, the actual tax saved will be less than the cap
BOI · Updated 19 September 2026
BOI backs Solar Factory investment 2026 — what you still get, and what's been dropped
The BOI's 2026 investment promotion guide has changed from what many people think: solar cell/panel manufacturing is in group A2 with an 8-year corporate income tax exemption, but new investment projects are not promoted, and existing factories "installing solar for their own use" have been removed from the renewable energy efficiency improvement measure
Updated
Key change
Installing solar purely for self-consumption no longer qualifies for the efficiency improvement measure
The BOI's 2026 investment promotion guide states, under the efficiency improvement measure for energy saving and renewable energy use, item (2), that "there must be investment in replacing machinery (excluding the installation of solar power generation systems) so that renewable energy is used in the business…" This is in line with BOI Announcement No. 3/2568 dated 5 June 2025 amending the renewable energy efficiency improvement measure, with applications submitted from 1 July 2025 onward using the new criteria
Corporate income tax exemption, group A2 — solar cell/panel manufacturing
0% of investment
3-year tax exemption cap under the efficiency improvement measure
0% of investment
5-year tax exemption cap under the SME efficiency improvement measure
0million baht
Minimum investment for the efficiency improvement measure (SMEs: 500,000 baht)
BOI 2569
3 paths the BOI still supports in 2026
Each path has different conditions and caps — look only at the one that fits your business. Everything below is taken from the BOI's 2026 investment promotion guide
Group A2 — 8-year corporate income tax exemption
Category 4.2.12.1 (manufacture of solar cells and/or raw materials for solar cells) and category 4.2.12.2 (manufacture of solar panels from solar cells produced in the same project) are in privilege group A2
Group A2 receives an 8-year corporate income tax exemption with a cap (not exceeding the investment amount in the proportion set by the Board)
All group A activities receive import duty exemption on machinery plus non-tax privileges such as land ownership, visas and work permits
Condition: manufacturing processes and Energy Yield must be approved by the Board
Note: new investment projects are not promoted — existing projects can apply under the industry upgrade measure (Smart and Sustainable Industry) and the investment promotion measure for community and social development
Calculate your tax exemption cap
Enter your investment (excluding land and working capital) to see the corporate income tax exemption cap under each measure
Measures used
3-year tax exemption · cap 50% of investment · minimum 1,000,000 baht
5,000,000 baht
500,00050,000,000
Your business's corporate income tax rate
General businesses pay 20%; SMEs pay tiered rates based on net profit
Maximum tax exemption cap (3 years)2,500,000baht
Total net profit needed to use the full cap (at 20%)12,500,000baht
The tax exemption cap is the maximum corporate income tax you don't have to pay during the privilege period — it is not cash paid back by the government, and you can only use the full cap if the business makes enough profit. The "required profit" figure below is calculated only from the corporate tax rate you select. Actual conditions follow BOI announcements and your promotion certificate
Quick check: does your project still qualify?
Answer 4 questions based on the conditions in the BOI 2026 guide — a preliminary assessment, not a BOI ruling
Draw up a machinery replacement/efficiency improvement plan with indicators that meet the Office's criteria, and check that your business type isn't on the excluded list
Step 2
Submit the promotion application
Submit your application to the BOI with supporting documents — the BOI's online system is called e-Investment Promotion
Step 3
Present the project and receive the resolution
Solar + BESS
What about Solar + BESS?
BOI Announcements No. 2/2568 dated 9 April 2025 and No. 3/2568 dated 5 June 2025 are both "amendments to the renewable energy efficiency improvement measure," as listed in the BOI announcement index
Summaries from law firms LawPlus and Bangkok Global Law agree that battery energy storage systems (BESS) and BESS inverters are eligible equipment, with the investment counted toward the tax exemption capped per 1 megawatt of capacity, and applications submitted before 30 June 2025 using the old criteria
This section is based on law firm summaries, not the full announcement text. Before investing, obtain the actual announcement from the BOI or consult a BOI advisor directly
Zero capex
If your project doesn't qualify for the BOI — there's still a zero-investment option
A Private PPA is a private power purchase agreement: the provider invests in, installs and maintains the system, and the factory pays only for the electricity the system actually produces at an agreed rate lower than the utility's. Ideal for factories or offices with heavy daytime use, operating almost every day, with large roof areas
No upfront investment — the provider invests in and maintains the system for the full contract term
Full article
BOI solar for factories 2026 — conditions and tax benefits
Original article published · For BOI conditions in 2026, follow the sections above, which cite the latest BOI guide
Read the full article+
For industrial factory owners, "electricity" is often one of the biggest production costs eating into profit. With the Ft charge fluctuating in 2026, factory solar has become unavoidable — and the good news is you may not have to pay the full installation cost
Many people have heard that "install solar, get BOI support and cut costs by 50%." How true is it, what conditions are hidden, and what has changed this year? This article lays out the numbers to show how much the "real price" after incentives speeds up a factory's payback
Does the BOI really pay 50%?
First, understand that "cut costs by 50%" in BOI terms doesn't mean the government hands back half in cash the moment you buy. It comes as a "Corporate Income Tax Exemption"
Under the measure to upgrade industry for energy savings, the BOI lets factories that install solar for self-consumption deduct the investment from their taxes, subject to these main conditions
Benefit: 3-year corporate income tax exemption
Exemption cap: up to 50% of the investment (excluding land and working capital)
Key 2026 condition: since mid-2025 the BOI has become stricter, favoring projects that use advanced technology or are installed with energy storage (BESS) or smart energy management, in line with Grid Modernization
In short
Suppose your factory already pays tax on its profits every year. Instead of paying the full amount to the Revenue Department, you can use that money to "pay yourself back" for the solar installation — effectively the government covers 50% of the installation through the tax system
The numbers: factory solar with BOI vs. without BOI
To make it as clear as possible, let's compare a mid-sized factory installing a 500 kWp system, assuming:
The text on this page is based mainly on the BOI's 2026 investment promotion guide; details of the amending announcements come from the announcement index and law firm summaries. For the full text, request it from the BOI directly
Explain the project details to BOI officers; once approved, accept the resolution and request the promotion certificate
Step 4
Complete within 3 years
The approved plan must be completed within 3 years of the certificate issue date
Step 5
Tax exemption starts
The corporate income tax exemption period starts from the date of first income after receiving the promotion certificate
It's not free power — you still pay for the units produced, so read the contract terms carefully
With EV Power Energy: we invest, design, install and maintain everything, and at the end of the contract the system is transferred to the customer under the agreed terms
The PPA model's definition and pros and cons are cited from a Masstec Link article; the ownership transfer terms are EV Power Energy's own service terms
Installation investment: 12,000,000 baht (hypothetical figure for the calculation)
Electricity savings: 2,400,000 baht/year
The factory has enough net profit to owe more tax than the exemption cap
Comparison
Self-funded (No BOI)
With BOI
Initial investment
12,000,000 baht
12,000,000 baht
Tax benefit (cap 50%)
0 baht
6,000,000 baht
How you get it back
–
No corporate income tax on a total of 6 million baht over 3 years
Net cost after tax
12,000,000 baht
6,000,000 baht
Annual electricity savings
2,400,000 baht
2,400,000 baht
Payback period
5 years
2.5 years
Return on investment (IRR)
~18–20%
~35–40%
Insight: with BOI support, payback drops to just 2–3 years — a better investment than almost any other machinery in the factory
Which factories can apply for BOI solar support?
Not every factory qualifies right away. You must meet these basic criteria:
Your business is a BOI-promoted activity, which covers almost all manufacturing and some services
It must be an existing, operating project, since this measure is an "Improvement"
Investment of at least 1 million baht (500,000 baht minimum for SMEs)
Installation must be completed within 3 years of receiving the promotion certificate
How to apply for BOI solar support in 2026
The process is straightforward if your documents are complete, and almost all of it is now done online (e-Investment)
1. Submission
Submit an application through the e-Investment Promotion system, choose the "Efficiency Improvement measure" and specify your plan, the equipment used (panels, inverter) and projected energy savings
2. Project presentation
BOI officers will schedule an interview (usually online) to go over the project. Have your engineering team or consultant ready with the technical details
3. Approval and acceptance
Once approved you'll receive a resolution letter, which you must accept within 1 month
4. Certificate issuance
Submit documents to have the promotion certificate issued — your key to claiming the benefits
5. Implementation
Install the solar system, import equipment (if any) and connect to the grid
6. Tax incentive claim
After installation, a credible third party (such as an energy institute or university) must assess the energy savings, and the resulting certificate is used to claim the tax exemption with the Revenue Department
Latest BOI conditions for 2026 (watch out)
The latest BOI announcement (effective since mid-2025) includes important changes factory owners need to know
BESS condition: a self-consumption Solar Rooftop project on its own may not qualify for the tax exemption. In some cases the BOI encourages installing it together with energy storage (BESS) for grid stability
Technology: solar panels and inverters must be new machinery — no second-hand equipment
Tip: before signing an installation contract, consult a company experienced with the BOI to check that your specs and project format still meet the latest 2026 criteria
Tax deductions of up to 200,000 baht for homeowners and businesses
Beyond factories, the government has also introduced incentives for households. On 25 November 2025, the Cabinet approved in principle a draft Royal Decree under the Revenue Code granting tax exemptions to encourage people to switch to solar energy
The key point is the "solar installation tax deduction" measure: individuals can deduct up to 200,000 baht from personal income, under Revenue Department Notification No. 3/2026
Why did the government introduce this measure?
The country's big goals are Carbon Neutrality and Net Zero greenhouse gas emissions. The Revenue Department estimates this tax measure will cut national electricity use by up to 25,545 million units a year and reduce LNG imports for power generation by more than 88,300 million baht
Measure for individuals (household Solar Rooftop)
Personal income taxpayers can deduct the actual "equipment and installation costs" of a Solar Rooftop system, up to a total of 200,000 baht
Solar costing 150,000 baht: deduct the full 150,000 baht
A larger system costing 300,000 baht: deduct up to the 200,000-baht cap
Who is eligible
Individuals only (excluding ordinary partnerships and non-juristic bodies of persons)
Homeowners installing on the roof, rooftop or any part of their residential building
Using a Type 1 electricity meter, the standard residential meter
Technical requirements
Must be a grid-connected (On-Grid) system connected to the Metropolitan Electricity Authority (MEA) or Provincial Electricity Authority (PEA)
Hybrid systems qualify if connected to the grid, but Off-Grid systems (not connected to the utility) do not
Total installed capacity of no more than 10 kWp per home, in line with residential connection rules
Timing and claiming
Program period: from the day after the law is published in the Royal Gazette until 31 December 2028
Tax year to claim: the tax year in which the "grid connection is completed," not the year you paid (e.g. paid in 2026 but connected in 2027 — claim in the 2027 tax year)
One claim, for one system only, for the entire program period
Documents for the Revenue Department
A full electronic tax invoice (e-Tax Invoice) is required
Payment must be made to a VAT-registered business
Measure for companies and business owners
Beyond homes, the Cabinet also approved a measure to reduce business costs under the "tax measure to promote high-efficiency machinery, equipment and energy conservation materials"
Benefit: 1.5× deduction
Individuals with income under Section 40(5)–(8), such as dormitory owners, medical clinics, architects and contractors, can deduct 1.5× their investment
Companies and partnerships can expense 1.5× the investment, e.g. invest 1 million baht and book 1.5 million baht as a tax expense — worth roughly 50% of the investment in tax savings
Equipment conditions and restrictions
Must be energy conservation machinery/equipment/materials with a 5-star energy efficiency label from the Department of Alternative Energy Development and Efficiency (DEDE)
Must be new, never used, and located in Thailand
Cannot be claimed in addition to BOI or EEC privileges
Requires an e-Tax Invoice, as with the household measure
Home vs. business entitlements
Item
Home (individual)
Business/company
Entitlement
Deduct actual cost, up to 200,000 baht
Expense 1.5×
System size
Up to 10 kWp
Based on actual use
Equipment
On-Grid, MEA/PEA standard
5-star efficiency label (DEDE)
Documents
e-Tax Invoice
e-Tax Invoice
Limits
1 person / 1 system
No double-claiming with BOI/EEC
5-step checklist to secure your entitlement
Check readiness: make sure the meter owner's name matches the person claiming, and that the roof structure can take the system
Choose a professional installer: a VAT-registered company that can issue e-Tax Invoices
Install and get approval: install the Solar Rooftop (homes up to 10 kW) and apply for grid connection with the utility (MEA/PEA) — the law counts the "date of successful connection" as the claim date
Handover and paperwork: confirm the system is generating, receive the e-Tax Invoice and keep the utility's approval documents
File your taxes: enter the deduction on Form P.N.D. 90/91 for the tax year in which the connection was completed
The math: how much do you gain by installing this year?
Installing in 2026–2028 is good timing because you gain twice
Gain
Details
Value
Gain 1: electricity savings
A 5 kW system produces ~600–700 units/month @ 5 baht
~3,000–3,500 baht/month (>40,000 baht/year)
Gain 2: tax deduction
200,000 baht installation, 20% tax bracket
40,000 baht in tax savings
Combining both, payback for a home drops to just 3–5 years
Frequently asked questions (FAQ)
Q: I installed solar earlier. Can I claim retroactively?
A: No. The law requires the expense and installation to occur from the day after the law is published in the Royal Gazette
Q: My home has several meters. Can I combine the claims?
A: Only 1 person / 1 system, and it must be a residence (Type 1 meter). If you have several homes, family members who separately own the property and the meter may each claim for a different home
Q: Can I claim if I buy the equipment and install it myself (DIY)?
A: You risk losing the entitlement, because the law requires a grid-connected (On-Grid) system that passes the utility's standards inspection and an e-Tax Invoice from a registered business — DIY installations often can't provide complete documents and approvals
Summary
The BOI helps factory solar pay off faster — from 5 years down to 2–3 years — but it requires planning from the start: system design (especially Solar + BESS), document preparation and tax planning
The EV Power Energy team can help from site assessment and Solar + BESS design matched to your factory's usage through to preparing the information for your incentive application, so you get the highest return on your investment
Note: the information above is a general overview for educational purposes and the calculations are hypothetical. Official conditions and benefits may change, so check the latest BOI and Revenue Department announcements or consult an expert before proceeding