Solar for Business

Solar packages (business)

For businesses turning electricity costs into profit, and businesses looking for their breakeven point — our team offers free consultations

Solar packages (business)

Two ways to go solar

Invest yourself — or invest nothing at all

We compare both against your real usage and help you pick the one with the best return.

Own the system

Own the system from day one and keep every baht of savings — ideal if you want the highest long-term return.

  • Your business keeps 100% of the savings
  • Installation is tax-deductible as a business expense, with possible BOI benefits if you qualify
  • Rather not pay upfront? Spread it out with solar financing

Install solar without investing yourself

EV Power Energy funds and runs the system on your roof — you pay only for the power it actually produces.

  • Zero investment — No lump sum, no impact on your credit lines, and nothing to record as an asset
  • Lower bills from the very first month — Pay for solar power at a lower rate than your normal bill as soon as the system starts supplying power
  • Maintenance is on us — Panel cleaning, maintenance, equipment replacement and insurance for the full contract term
  • Support ESG goals — Cut the carbon emissions from the electricity you use, with historical production reports
Rooftop solar on a commercial building, installed by EV Power Energy

Why us

Electricity is a cost — we turn it into an investment

For businesses, electricity is a big cost that squeezes profit every month. Solar turns this expense into an investment with clear returns, especially for factories and buildings with heavy daytime use

Our engineers analyze your real load, design the system to supply power during your peaks, and calculate breakeven in detail, with advice on tax and BOI benefits

Most businesses pay back faster than homes because they use daytime power fully. Once paid back, lower energy costs become a long-term competitive advantage

  • 01

    Load analysis and system design based on real usage

  • 02

    Suitable for factory roofs, buildings and large areas

  • 03

    We handle all permits — the utility (PEA/MEA), the Ministry of Energy and the municipality/sub-district office

  • 04

    Help with tax planning and BOI benefits

  • 05

    Fast payback, lower production costs long-term

How it works

Decide on numbers, not guesswork

Every project starts from real usage data before we design or quote.

  1. 01

    Send your bill

    We start from your past bills and site location to assess feasibility.

  2. 02

    Load analysis

    Engineers study your real usage and peaks, and survey the roof and electrical system.

  3. 03

    Design and break-even

    A detailed proposal with system size, savings and break-even — for both outright purchase and PPA.

  4. 04

    Permits and installation

    We file every permit with the utility, Ministry of Energy and local authority, then install to standard.

  5. 05

    Monitoring and ongoing care

    We track generation and maintain the system so it keeps performing at its best.

Solar PPA

Install solar without investing yourself

A PPA (Power Purchase Agreement) is a contract to buy electricity from a solar system. EV Power Energy invests in, designs, installs and maintains the whole system on your roof, and your business pays only for the electricity it actually produces at a pre-agreed rate lower than the utility's. When the contract ends, the system is transferred to you under the agreed terms

Zero investment

No lump sum, no impact on your credit lines, and nothing to record as an asset

Lower bills from the very first month

Pay for solar power at a lower rate than your normal bill as soon as the system starts supplying power

Maintenance is on us

Panel cleaning, maintenance, equipment replacement and insurance for the full contract term

Support ESG goals

Cut the carbon emissions from the electricity you use, with historical production reports

How PPA works

  1. 1
    Quick estimate
    1–2 days

    Send your past electricity bills and building location, and we'll assess feasibility and an indicative tariff before you decide

  2. 2
    Site survey
    About 1 week

    Inspect the roof structure, installation area, electrical system and daytime usage pattern

  3. 3
    Quotation and draft contract
    1–2 weeks

    Specifies the system size, estimated annual production, contract tariff, contract term and expected savings

  4. 4
    Design and procurement
    2–4 weeks

    Engineering design, relevant permits and ordering equipment to the agreed specs

  5. 5
    Installation and testing
    2–8 weeks

    Timing depends on system size; installed to engineering standards and tested before going live

  6. 6
    Power supply and ongoing care
    For the full contract term

    Billing starts on the units actually produced, with system monitoring and scheduled maintenance

Which businesses suit a PPA?

  • ✓Average electricity bills of about 100,000 baht/month or more
  • ✓Heavy daytime use, matching the hours solar produces power
  • ✓A roof structure that can bear the load, with enough installation space
  • ✓Operating at the same location for the full contract term

Our business customers

Industrial factoriesWarehouses / distribution centersHotels and resortsHospitalShopping malls / community mallsOffice buildingSchools and educational institutionsLarge restaurants and gyms

PPA vs. buying the system yourself

TopicsPPABuy it yourself
Upfront investmentNonePay in full or borrow
System owner during the contractEV Power EnergyThe customer owns it
Maintenance / insuranceThe provider is responsibleThe business is responsible
What you pay monthlyElectricity based on units producedLoan installments (if borrowing) and system maintenance
SavingsThe difference in electricity cost from the first monthSlower payback in the long run
When the contract endsSystem transferred under the agreed termsOwned from the start

PPA FAQ

What do I need to invest at the start?+

Nothing for equipment or installation — the provider invests in everything. Your business just provides the roof space and electricity usage data

Who is responsible if the system breaks down?+

The provider handles maintenance, equipment replacement and insurance for the full contract term at no extra cost to your business

Can the contract tariff go up?+

The tariff and any price adjustment terms are clearly stated in the contract from the start, so you can forecast costs — unlike utility electricity, which fluctuates with the Ft charge

What if the roof needs repairs during the contract?+

Let us know in advance so we can plan together. Our team will remove and reinstall the panels on the agreed schedule

Can capacity be expanded later?+

Yes. If your usage grows or more roof space becomes available, the system can be expanded and the contract adjusted to the new size

Who owns the system when the contract ends?+

The system becomes your business's asset under the stated terms, and keeps producing power with no new investment

Send 3 months of past electricity bills and we'll assess an indicative tariff and savings within 1–2 days

Get a free PPA assessment

Real installations

Businesses running on our solar

Photos from real EV Power Energy job sites

See all projects

Register

Free solar consultation for business

Tell us your monthly bill and location — our engineers will estimate system size and break-even for you.

What happens next

  1. 1Our team calls you back about your power usage
  2. 2We analyse your bills and book a site survey
  3. 3Receive a proposal with break-even for both purchase and PPA
Or contact us directly 090 456 6646LINE
Register

Get a special price offer

Free consultation and site survey! ROI calculated before you decide

Frequently asked questions

Returns, permits, tax and installation time for factories and businesses.

How good is the ROI of factory and business solar?

Factories that use power during the day see an IRR (internal rate of return) of 15–25% a year, payback in 4–6 years and savings of 500,000–5,000,000 baht a year, depending on system size and existing bills

What permits do factory and business solar systems need?

MEA/PEA approval for On-Grid systems; large systems (>200 kW) also need an ERC license. EV Power Energy handles every step of the permit process

Can a company deduct solar costs for tax purposes?

Yes, 100%. Solar installation is a business expense that is fully tax-deductible, and you may also qualify for additional BOI tax benefits if you meet the criteria

How long does a factory solar installation take?

Survey, design and permits take 2–4 weeks, installation 3–7 days (depending on size) and inspection and handover 1–3 days — about 1–2 months for the whole process

Can small SMEs install solar?

Yes. Shops, offices and warehouses can start at 10–30 kW. We design to your budget and actual electricity use, with no minimum size

LINE